ISSN 2096-4498 CN 44-1745/U
隧道建设(中英文) ›› 2010, Vol. 30 ›› Issue (4): 434-438.
• 规划与设计 • 上一篇 下一篇
李国清
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
LI Guo-Qing
Received:
Revised:
Online:
Published:
摘要:
以北京地铁换乘车站设计现状为研究对象,分析北京现状地铁换乘站所存在的问题,包括“换乘距离”、“换乘时间”、“换乘方式”、“人性化设计”、“无障碍换乘”,通过与现状地铁换乘站功能比较,总结过去地铁换乘站设计经验,并对今后地铁设计提出一些有价值的意见及建议。
关键词: 北京地铁换乘站, 既有换乘站, 新线换乘站, 组织体系, 第三方评价
Abstract:
In order to analyze the existing problems of transfer stations of Beijing Metro, the existing design of transfer stations of Beijing Metro is studied in terms of transfer distance, transfer time, transfer mode, peopleoriented design and barrierfree transfer. Some significant suggestions are made for Metro design on basis of comparison between the proposed design and the existing design of transfer stations and summarization of the design experiences of transfer station in the past.
李国清. 北京地铁换乘站设计现状及建议[J]. 隧道建设, 2010, 30(4): 434-438.
LI Guo-Qing. Stateofart of Design of Transfer Stations of Beijing Metro and Some Suggestions[J]. Tunnel Construction, 2010, 30(4): 434-438.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/
http://www.suidaojs.com/CN/Y2010/V30/I4/434