ISSN 2096-4498 CN 44-1745/U
隧道建设(中英文) ›› 2011, Vol. 31 ›› Issue (S2): 191-194.
• 施工技术 • 上一篇 下一篇
郭辉
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
GUO Hui
Received:
Revised:
Online:
Published:
摘要: 结合深圳地铁5号线百—布区间桩基托换实例,介绍桩基托换技术的施工流程及相应工艺。通过监控量测最终证明了预应力主次梁系主动托换形式以及自锁式抗震节点处理的重要意义,对后续类似工程提供一定的参考价值。
Abstract: The pile foundation underpinning procedure and technology are presented, with the file foundation underpinning construction of Baigelong stationBuxin station section on Line 5 of Shenzhen Metro as an example. The importance of the underpinning mode of prestressed concrete beamandgrider and treatment of selflocking antishock node is proved by means of monitoring. The paper can provide reference for similar projects in the future.
Key words: Shenzhen Metro, underneath crossing, building, pile foundation underpinning
郭辉. 区间隧道下穿建筑物桩基托换技术[J]. 隧道建设, 2011, 31(S2): 191-194.
GUO Hui. Construction Technology of Underpinning of Pile Foundation of Tunnels underneath Crossing Buildings[J]. Tunnel Construction, 2011, 31(S2): 191-194.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/
http://www.suidaojs.com/CN/Y2011/V31/IS2/191