隧道建设(中英文) ›› 2016, Vol. 36 ›› Issue (8): 1016-1022.DOI: 10.3973/j.issn.1672-741X.2016.08.019

• 施工机械 • 上一篇    

大直径硬岩掘进机(TBM)在吉林中部城市引松供水工程四标TBM3的应用

贺飞, 曾祥盛, 齐志冲   

  1. (中铁工程装备集团有限公司, 河南 郑州 450016)
  • 收稿日期:2015-11-25 修回日期:2016-03-17 出版日期:2016-08-20 发布日期:2016-08-17
  • 作者简介:贺飞(1984—),男,贵州石阡人,2007年毕业于贵州大学,机械设计制造及自动化专业,本科,工程师,现主要从事隧道掘进机设计研发工作。Email: tbm666@126.com。
  • 基金资助:

    国家高技术研究发展计划“863计划”(2012AA041801)

Application of Largediameter Hard Rock Tunnel Boring Machine (TBM) to TBM3 Section of No. 4 Bid of Songhua River Water Conveyance Project in Middle Jilin Province

HE fei, ZENG Xiangsheng, QI Zhichong   

  1. (China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016, Henan, China)
  • Received:2015-11-25 Revised:2016-03-17 Online:2016-08-20 Published:2016-08-17

摘要:

为了研究中铁工程装备集团有限公司自主研制的首台TBM的各项技术特点与工程适应性,结合TBM在引松供水工程总干线四标段的掘进施工情况,分析了TBM掘进地层特点以及主要设计参数。引松供水工程四标段掘进岩层复杂多变,富含大量断层破碎地层以及风化灰岩地层,部分地层岩石强度大且石英含量高,对TBM刀盘及刀具要求极高,TBM刀盘面板采用270 mm厚板设计,且刀座基座直接在刀盘面板上加工而成,刀具按非线性方式布置且刀间距控制在82~90 mm;设计了有效的TBM初期支护系统和材料运输平台,并且搭载了激发极化超前地质预报系统。工程掘进结果表明: 该台TBM刀盘设计可靠性强且能保证高效破岩,创造了最高月进尺1 226 m、日进尺70.8 m的优异成绩,TBM在不良地质下支护高效快速,超前地质探测结果可靠,各系统运行情况良好。

关键词: 引松供水工程, 大直径硬岩掘进机(TBM), 刀盘厚板技术, 超前地质预报

Abstract:

The characteristics and main design parameters of largediameter hard rock TBM used in No. 4 Bid Section of the Songhua River Water Conveyance Project are analyzed. The rock strata of the project are complicate; there are many fracture zones and limestone and quartz locally; and it requires highperformance of TBM cutterhead and cutting tools. As a result, the TBM cutterhead is manufactured by 270 mm thickness plate; the nonlinear distance among cutting tools is 82-90 mm; effective primary supporting system and material transportation platform are designed; and advance geology prediction system is adopted. The construction practice shows that the TBM cutterhead designed is reliable and highefficient; the supporting efficiency of TBM in bad geological conditions is high; and the advance geology prediction results are reliable.

Key words: Songhua River Water Conveyance Project, largediameter hard rock tunnel boring machine (TBM), cutterhead manufactured by thick plate, advance geology prediction

中图分类号: