摘要:
无碴轨道底板作为无碴轨道下部基础的主要承载层,其施工质量要求很高,结合隧道作业空间狭小的特点,如何快速、优质完成底板的施工,便成为客运专线隧道施工中的一个重点。通过对大别山隧道无碴轨道底板施工的介绍,以此期望为其它客运专线隧道底板施工提供经验及借鉴。
Abstract:
As the major loadbearing layer of the understructure of the nonballast track, the floor slab of the nonballast track system has high requirements in construction quality. Due to the narrow working space inside the tunnels, the rapid and highquality construction of the floor slabs inside tunnels becomes one of the most important aspects in the construction of passengerdedicated railway tunnels. The construction of the floor slabs of the nonballast track system inside Dabieshan tunnel is presented in the paper, which can provide reference for the construction of the floor slabs in other passengerdedicated railway tunnels.
中图分类号:
U213.2 
王延民,奚正兵. 客运专线隧道无碴轨道底板施工技术[J]. 隧道建设, 2008, 28(2): 228-231.
WANG Yanmin, XI Zhengbing. Construction Technology for Floor Slabs of Nonballast Tracks in Passengerdedicated Railway Tunnels[J]. Tunnel Construction, 2008, 28(2): 228-231.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/B
http://www.suidaojs.com/CN/Y2008/V28/I2/228