ISSN 2096-4498 CN 44-1745/U
隧道建设(中英文) ›› 2008, Vol. 28 ›› Issue (5): 601-604.DOI: B
• 施工技术 • 上一篇 下一篇
赵喜斌, 郭得福
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
DIAO Chi-Bin, GUO De-Fu
Received:
Revised:
Online:
Published:
摘要:
防止溜车是斜井有轨运输施工及运输安全管理的重中之重,在新建龙岩至厦门铁路象山隧道斜井有轨运输施工中,通过运输管理实践,总结分析了有轨运输斜井溜车的各种原因,提出相应的针对性防控措施,确保了斜井有轨运输的安全。
Abstract:
The prevention of mining car sliding is the key of trackbound transportation system in inclined shaft and the key of safety management. According to the experience of the trackbound transportation system in inclined shafts in Xiangshan tunnel of LongyanXiamen railway, the author analyses the sliding factors and puts forward corresponding prevention measures so as to ensure the safety of trackbound transportation system in inclined shaft.
Key words:  , trackbound transportation systeminclined shaftmining car slidingprevention measures
中图分类号:
TD262.1+2
赵喜斌, 郭得福. 象山铁路隧道斜井有轨运输溜车分析及防控措施[J]. 隧道建设, 2008, 28(5): 601-604.
DIAO Chi-Bin, GUO De-Fu. Analysis of Mining Car Sliding Problems and Countermeasure for Trackbound | Transportation System in Inclined Shafts in Xiangshan Railway Tunnel[J]. Tunnel Construction, 2008, 28(5): 601-604.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/B
http://www.suidaojs.com/CN/Y2008/V28/I5/601