ISSN 2096-4498 CN 44-1745/U
隧道建设(中英文) ›› 2006, Vol. 26 ›› Issue (1): 10-13.DOI: A
• 研究与探索 • 上一篇 下一篇
骆建军, 张顶立, 王梦恕, 张成平
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
JIA Jian-Jun, Zhang-Ding-Li, Wang-Meng-Shu, Zhang-Cheng-Beng
Received:
Revised:
Online:
Published:
摘要:
以北京地铁四、十号线黄庄站工程为背景、结合现场施工临控量测结果,总结了四号线黄庄站在浅埋暗挖法施工下地表及拱顶沉降产生的原因及沉降规律,并提出控制沉降的措施。对后续工程施工起到指导作用。
Abstract:
On basis of the results of the monitoring and measurement of Huangzhuang station of line No. 4 and No. 10 of Beijing Metro, the article summarizes the reasons and regular pattern of ground surface settlement and crown subsidence of Huangzhuang station of line No. 4 of Beijing Metro constructed by shallowburied undercutting method, and presents relevant countermeasures to control the settlement. The article can provide guidance for the construction of similar works in the future.
中图分类号:
 
U455.4
骆建军, 张顶立, 王梦恕, 张成平. 地铁施工沉降监测分析与控制[J]. 隧道建设, 2006, 26(1): 10-13.
JIA Jian-Jun, Zhang-Ding-Li, Wang-Meng-Shu, Zhang-Cheng-Beng. Analysis on and Control of Settlement in Metro Construction[J]. Tunnel Construction, 2006, 26(1): 10-13.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/A
http://www.suidaojs.com/CN/Y2006/V26/I1/10