地下工程建设的规模越来越大,对施工方法和施工监控量测提出更高的要求。监控量测能直观反映围岩及结构的稳定性,监测分析可用于修改施工支护参数,实现信息化施工。对某隧道工程修建中涌水量、围岩周边位移和拱顶下沉的量测,及时分析反馈信息,为隧道信息化施工提供了理论支持,取得令人满意的结果。
Abstract:
The construction of underground works has become larger and larger in scale, which renders high requirements on construction methods and on construction monitoring and measurement. Monitoring and measurement can visually reflect the stability of the surrounding rock mass and the structures, and monitoring analysis can be used to modify construction support parameters so as to achieve informationaided construction. During the construction of a tunnel, the water inflow rate, surrounding rock displacement and crown settlement are measured, and information analysis and feedback are timely conducted, which provides the theoretical basis for the informationaided construction of the tunnel. In the end satisfactory results are achieved.
Key words:  , underground works  , construction monitoring and measurement informationaided construction
王晶. 某地下工程施工监控量测[J]. 隧道建设, 2005, 25(6): 50-52,56.
WANG Jing. Construction Monitoring and Measurement of Underground Works[J]. Tunnel Construction, 2005, 25(6): 50-52,56.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/
http://www.suidaojs.com/CN/Y2005/V25/I6/50