摘要:
结合深圳前湾海底隧道工程,较详细地论述了过海隧道泥水盾构的施工原理和施工方法,包括施工的基本程序和管理基准,重点介绍了盾构始发的准备工作,试掘进应注意的问题及正常掘进中的各种参数控制。
Abstract:
Taking Qianwan sub-sea tunnel in Shenzhen as an example, the article presents the construction principles and construction methods of a subsea tunnel by means of slurry shield machine, including the basic construction procedures and the construction management criteria. The article places its emphasis on the description of the preparation works for the launching of the shield machine, items which special attention should be paid to during trial boring and the control of various parameters of normal boring.
中图分类号:
U455.43
U459.5
张学军, 谢仁根, 马小汀. 小断面过海隧道泥水盾构施工技术[J]. 隧道建设, 2006, 26(增刊1): 1-4,24.
ZHANG Hua-Jun, XIE Ren-Gen, MA Xiao-Ding. Construction Technology of Small Crosssection Subsea Tunnel by means of Slurry Shield Machine[J]. Tunnel Construction, 2006, 26(增刊1): 1-4,24.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/B
http://www.suidaojs.com/CN/Y2006/V26/I增刊1/1