钢筋混凝土管片的制作是盾构隧道施工的重要环节之一,结合工程实践,对管片的设计与制作工艺,试验方法及运输中应注意的事项等进行了详细的论述,重点介绍了管片生产中的几道关键工序。
Abstract:
The prefabrication of the reinforced concrete segments is one of the most important aspects of the shielddirven tunnel construction. On basis of engineering practice, the article expatiates on the design and prefabrication process and test methods of the segments, as well as on the issues to which special attention should be paid during the transportation of the segments. The article places it emphasis on the presentation of the key procedures of the prefabrication of the segments.
Key words: segment for shielddriven tunnel  , prefabrication  , management
中图分类号:
U455.4
秦汉礼. 盾构隧道钢筋混凝土管片制作技术[J]. 隧道建设, 2006, 26(增刊1): 28-31.
QIN Han-Li. Prefabrication Technology of Reinforced Concrete Segments for Shielddriven Tunnels[J]. Tunnel Construction, 2006, 26(增刊1): 28-31.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/B
http://www.suidaojs.com/CN/Y2006/V26/I增刊1/28