以客运专线合武三标长岭关铁路隧道在开挖中,采用无棱镜激光测距全站仪,代替先进的断面仪对隧道轮廊进行的测量放样为例,并从内业准备、开挖面放样、断面数据的采集与整理等几个方面进行了较为详细的阐述,该方法取得了较好的经济效果和较高的测量精度,为类似设备拓宽使用范围可提供较好的借鉴。
关键词: 大断面隧道  , 隧道测量 开挖放样 数据整理
Abstract:
During the excavation of Changlingguan tunnel on Hefei~Wuhan passengerdedicated railway, prismfree laser distancemeasuring total stations, instead of sophisticated profilers, are used to set out the profile of the tunnel. In the paper, the settingout of the tunnel profile by means of prismfree laser distancemeasuring total stations is presented in terms of indoor preparation, excavation face settingout and profile data acquisition and processing. By means of this method, satisfactory economic results and high surveying accuracy are achieved. The paper can provide reference for the enlarging of the application scopes of similar instruments in the future.
Key words: tunnel with large crosssection tunnel survey excavation settingout, data processing
中图分类号:
U456.3
杜发平. 大断面客专隧道在开挖过程中的测量[J]. 隧道建设, 2007, 27(增刊1): 62-64.
DU Fa-Beng. Excavation Settingout of Passengerdedicated Railway Tunnels with Large Crosssections[J]. Tunnel Construction, 2007, 27(增刊1): 62-64.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/B
http://www.suidaojs.com/CN/Y2007/V27/I增刊1/62