ISSN 2096-4498 CN 44-1745/U
隧道建设(中英文) ›› 2007, Vol. 27 ›› Issue (增刊): 26-29.DOI: A
• 研究与探索 • 上一篇 下一篇
蔚立元, 李术才, 徐帮树
收稿日期:
出版日期:
发布日期:
作者简介:
WEI Li-Yuan, LI Shu-Cai, XU Bang-Shu
Received:
Online:
Published:
摘要:
介绍了青岛胶州湾湾口海底隧道的工程概况并采用软件flac3D对隧道开挖和支护进行了两种方案的二维数值模拟。通过分析隧道周边关键点位移和围岩塑性区,研究了小间距海底隧道开挖支护过程对各条隧道围岩稳定性的影响,得出了有益于设计和施工的结论和建议。
Abstract:
The subsea tunnels located at Jiaozhou Bay in Qingdao is presented in this paper. Twodimensional numerical simulation of two schemes is performed using flac3D. The displacements at the key points in the tunnel and the plastic zones in the soil are analyzed to study the effects on the stability of surrounding ground induced by the constructions of parallel adjacent subsea tunnels. And some conclusions and suggestions which can help design and construction are given finally.
Key words: parallel adjacent subsea tunnels service tunnel interaction displacement at key point , plastic zone
中图分类号:
U459.5
蔚立元, 李术才, 徐帮树. 小间距海底隧道施工相互影响分析[J]. 隧道建设, 2007, 27(增刊): 26-29.
WEI Li-Yuan, LI Shu-Cai, XU Bang-Shu. Construction Interaction among Parallel Adjacent Subsea Tunnels[J]. Tunnel Construction, 2007, 27(增刊): 26-29.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/A
http://www.suidaojs.com/CN/Y2007/V27/I增刊/26