• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码

隧道建设(中英文) ›› 2007, Vol. 27 ›› Issue (增刊): 593-595.DOI: B

• 其他 • 上一篇    

地铁车站深基坑、大跨度吊运设备选型

 闫发荣   

  1. 中铁隧建筑有限公司市政五公司, 北京100022
  • 收稿日期:2007-03-19 修回日期:2007-06-04 出版日期:2007-08-10 发布日期:2010-04-20
  • 作者简介:闫发荣(1968-)|男|重庆铜梁人|中专学历|主要从事隧道与地下工程施工设备及物资管理、维修工作。

Selection of Lift Equipment in Deep and
Large Foundation Pit of Metro Station

 YAN Fa-Rong   

  1. The 5th Municipal Division of Beijing CTG Construction Co., Ltd., Beijing 100022
  • Received:2007-03-19 Revised:2007-06-04 Online:2007-08-10 Published:2010-04-20

摘要:

结合明挖地铁车站基坑的宽度、深度和场地条件,着重阐述了不同设备的起吊性能、效率、经济性及安全性对比。可为今后类似工程提升设备选型提供借鉴。

Abstract:

Based on the width, the depth and the ground condition of the opencut foundation pit of metro station, the economy, efficiency, security of different lift equipment are discussed, which can provides some suggestions for selection of lift technique in the future similar projects.

中图分类号: