潜盾隧道穿越建筑物保护工法与噪音防制之探讨

陈奕耿, 卢旭美, 游明德   

  1. 1.台北市政府捷运工程局中区工程处副处长; 2.台北市政府捷运工程局中区工程处工程员;
    3.台湾世曦工程顾问公司正工程司兼计划经理
  • 收稿日期:2007-06-12 出版日期:2007-08-10 发布日期:2010-04-20
  • 作者简介:卢旭美|男|硕士|现任台北市政府捷运工程局中区工程处工程员|主要从事捷运工程监造业务工作。

The Study of Protection Buildings and the Preventions of
Vibrations and Noises Caused by Bored Tunnel Passing the
Bottom of Structures

 CHEN Yi-Geng, LEI Xu-Mei, LIU Meng-De   

  1. 1. Deputy Director, Central District Project Office of DORTS, T.C.G.; 2. Junior Engineer, Central District Project Office of DORTS, T.C.G.; 3. Project Manager, CECI Engineering Consultants,Inc.,Taiwan
  • Received:2007-06-12 Online:2007-08-10 Published:2010-04-20

摘要:

台北捷运建造的目的,是为减少车潮对交通的冲击,因此捷运路线大部分选在建物邻立、交通频繁、人潮拥挤的路段,加以道路线形的限制,潜盾隧道不得不有穿越民房下方的设计,因此,有关穿越建筑物保护设计与施工,及通车营运后,列车行驶建筑物下方所引起的振动与噪音之防制,诚为捷运建设一相当重要之课题。
  本文以台北捷运芦洲线潜盾隧道穿越登峰大厦为例,将地下穿越大楼工程在设计规划阶段及掘进前对建筑物保护及噪音振动防治的努力,透过完善的施工管理、建物保护措施及现有建物及地面的监测系统,终能严密控制地层的变形,顺利完成潜盾隧道穿越大楼的工程,并深获住户肯定,对本局协调过程及施工成果相当满意,经由全体住户感谢奖牌,实为台北捷运工程之首例。

Abstract:

The main purpose for constructing Taipei MRT is to reduce the impact of traffic flow from cars. Therefore, most MRT lines are chosen at the sections with a lot of buildings, busy traffic and crowd people. Besides the restriction of the road alignment, the bored tunnel must be designed to cross the bottom of buildings. For this reason, the design of protection and construction for crossing buildings and the preventions of vibrations and noises caused by trains passing the bottom of structures are main topic in MRT constructions.
  This article is used Apex building crossed by the bored tunnel of Luchou line of Taipei MRT as an example. By the efforts of building protection and prevention of noise and vibration in the design phase, perfect management in construction phase and survey system for the ground face and existing buildings, the construction group finally can control the stratum distortion and succeed the bored tunnel project for passing through the bottom of buildings. Hence, all inhabitants are appreciated for DORTS efforts and decide to give a medal to show their thanks.

Key words: bored tunnel  , simultaneous backfill grouting  , double packer  , floating slab track