- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
盾构隧道施工对既有铁路轨道与排洪涵管影响的数值分析
收稿日期: 2011-10-11
修回日期: 2012-04-17
网络出版日期: 2012-07-09
Numerical Analysis on Influence on Existing Railway Tracks and Drainage Culverts Induced by Shield Tunneling
Received date: 2011-10-11
Revised date: 2012-04-17
Online published: 2012-07-09
黄生文,施成华,彭立敏,丁祖德,谢顺意 . 盾构隧道施工对既有铁路轨道与排洪涵管影响的数值分析[J]. 隧道建设, 2012 , 32(3) : 332 -335 . DOI: 10.3973/j.issn.1672-741X.2012.03.012
/
| 〈 |
|
〉 |