研究与探索

关角隧道富水区注浆圈合理控制参数研究

展开
  • (甘肃省交通规划勘察设计院有限责任公司, 兰州 730070)
田世雄(1984—),男,甘肃靖远人,2010年毕业于兰州交通大学桥梁与隧道工程专业,硕士,助理工程师,现从事隧道及地下工程结构设计及计算工作。

收稿日期: 2012-03-14

  修回日期: 2012-05-17

  网络出版日期: 2012-10-16

Study on Appropriate Control Parameters of Grouting Circle of  Guanjiao Tunnel in Waterrich Area

Expand
  • (Gansu Provincial Transportation Planning, Survey & Design Institute Co., Ltd., Lanzhou 730070, China)

Received date: 2012-03-14

  Revised date: 2012-05-17

  Online published: 2012-10-16

摘要

关角隧道为青藏铁路西(西宁)格(格尔木)二线控制工程。为了更好地解决关角隧道富水区防排水问题,以关角隧道水文地质为工程背景,采用有限元方法建立地下水注浆控制排放模型,对三叠系砂岩富水段进行模拟分析。分别分析了注浆止水圈渗透系数与厚度、节点流量的变化关系,得知富水区隧道注浆圈的控制参数具有其经济适用范围,并不是越大越好或越小越好;根据流量的变化过程验证了隧址区地下水位的变化情况;最后得出对于富水区隧道修建,取注浆圈厚度为3 m,渗透系数控制在2.1×10-3 m/d较为经济合理。研究成果对富水区隧道控制地下水排放、减轻对环境水资源的破坏具有一定的借鉴作用和指导意义。

本文引用格式

田世雄, 王永刚 . 关角隧道富水区注浆圈合理控制参数研究[J]. 隧道建设, 2012 , 32(4) : 490 -494 . DOI: 10.3973/j.issn.1672-741X.2012.04.011

Abstract

Guanjiao tunnel is the key works of the Second XiningGeermu Railway. The control and discharging of the groundwater is modeled and the sandy waterrich ground section is simulated by means of finite element method, so as solve the waterproofing and drainage problem of the waterrich section of Guanjiao tunnel. The relationship among the permeability coefficient of the waterstop circle, the thickness and the node flow amount is analyzed. Conclusions drawn are as follows: the parameters of the grouting circle in the waterrich section should be controlled in a certain range; the situation of the groundwater is verified by the node flow variation process; in the construction of tunnel in waterrich section, the thickness of the grouting circle should be 3 m and the permeability coefficient should be 2.1×10-3 m/d. The paper can provide reference for the control and release of the groundwater in tunneling so as to minimize the impact on the water resource environment.