- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
锦屏一级水电站地下厂房预应力锚杆张拉伸长值试验分析
收稿日期: 2011-11-02
修回日期: 2012-06-04
网络出版日期: 2012-10-16
Analysis on Tensioning Length Test on Prestressed Rock Bolt in Construction of Underground Powerhouse of Jinping I Hydropower Station
Received date: 2011-11-02
Revised date: 2012-06-04
Online published: 2012-10-16
张传红 . 锦屏一级水电站地下厂房预应力锚杆张拉伸长值试验分析[J]. 隧道建设, 2012 , 32(4) : 467 -473 . DOI: 10.3973/j.issn.1672-741X.2012.04.007
/
| 〈 |
|
〉 |