- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
盾构始发与到达端头地层加固方法选择与稳定性评价
收稿日期: 2012-09-06
修回日期: 2012-11-05
网络出版日期: 2012-12-28
Reinforcement Technology for and Stability Analysis on End Soil in Shield Launching and Arrival
Received date: 2012-09-06
Revised date: 2012-11-05
Online published: 2012-12-28
朱世友, 林志斌, 桂常林 . 盾构始发与到达端头地层加固方法选择与稳定性评价[J]. 隧道建设, 2012 , 32(6) : 788 -795 . DOI: 10.3973/j.issn.1672-741X.2012.06.007
Key words: shield tunneling; launching and arrival; reinforcement method; stability
/
| 〈 |
|
〉 |