热力管道大推力固定支架力学作用机制及设计计算方法
收稿日期: 2012-10-18
修回日期: 2012-11-29
网络出版日期: 2013-02-06
Mechanical Mechanisms and Design Calculation Methods for Fixing Supports of Thermal Pipes under Huge Pushing Forces
Received date: 2012-10-18
Revised date: 2012-11-29
Online published: 2013-02-06
董淑棉 . 热力管道大推力固定支架力学作用机制及设计计算方法[J]. 隧道建设, 2013 , 33(1) : 45 -53 . DOI: 10.3973/j.issn. 1672-741X.2013.01.008
Comparison and contrast are made between the results of the conventional calculation method and those of the optimized calculation methods, which shows that the simple weight balancing method is neither the most rational nor the most economic means to cope with the sliding of the fixing supports in opencut inspection chambers under huge pushing forces, and on the contrary, the passive soil pressure of the surrounding soil mass can be fully used. Simplified structural loadbearing analysis, numerical analysis, insitu test data analysis and case histories demonstrate that, to some extent, the primary reinforcement and the secondary lining of mined tunnels can undertake the pushing force together and that fixing supports under huge pushing forces can be installed at the tunnel entrance when necessary countermeasures have been taken.
/
| 〈 |
|
〉 |