- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
长大隧道双块式无砟轨道施工测量
收稿日期: 2012-09-25
修回日期: 2012-10-17
网络出版日期: 2013-02-06
Construction Survey for Biblock Ballastless Track in Long Tunnels
Received date: 2012-09-25
Revised date: 2012-10-17
Online published: 2013-02-06
牛春霞 , 吕宏权 , 何文浩 . 长大隧道双块式无砟轨道施工测量[J]. 隧道建设, 2013 , 33(1) : 65 -72 . DOI: 10.3973/j.issn.1672-741X.2013.01.011
There are strict requirements for the construction survey of biblock ballastless tracks.The survey means and methods for the biblock ballastless track are very advanced.GEDO CE track inspection trolley is used for the survey of the biblock ballastless tracks in long tunnels. The principle, methods and procedures of the survey of biblock ballastless track are presented and discussed.Conclusions drawn are as follows: 1) The key for ballastless tracks to achieve the designed functions lies the process control of the fine adjustment survey; 2) The most important indexes of the static fine adjustment are the control of the elevation and direction of tracks with 10 mlong chord and the variation of these two indexes will directly influence the dynamic acceptance of the works.
/
| 〈 |
|
〉 |