大断面黄土隧道施工工法研究
收稿日期: 2012-09-28
修回日期: 2012-10-26
网络出版日期: 2013-02-19
Analysis on the Construction Methods for Loess Tunnel with Large Crosssection
Received date: 2012-09-28
Revised date: 2012-10-26
Online published: 2013-02-19
石磊 , 侯小军 , 武进广 . 大断面黄土隧道施工工法研究[J]. 隧道建设, 2012 , 32(增刊1) : 8 -13 . DOI: 10.3973/j.issn.1672-741X.2012.z1.002
Tunnel construction monitoring on sit is was carried out by means of high precision total station and reflective film, with the monitoring of Dunliang tunnel as an example. The advantages, disadvantages and applicability of the double side drift method, single side drift method and threebench excavation method for loess tunnel with large crosssection are put into comparison, on basis of monitoring data analysis. Key deformation control technologies of different construction methods are obtained. The paper can provide references for similar projects in the future.
Key words: large crosssection; loess tunnel; construction method
/
| 〈 |
|
〉 |