填海区盾构掘进难点控制
收稿日期: 2012-06-19
修回日期: 2012-08-20
网络出版日期: 2013-02-19
Difficultycontrolling Technologies of Shield Tunneling in Reclamation Areas
Received date: 2012-06-19
Revised date: 2012-08-20
Online published: 2013-02-19
程林飞 , 许建飞 , 谭娇 . 填海区盾构掘进难点控制[J]. 隧道建设, 2012 , 32(增刊1) : 71 -74 . DOI: 10.3973/j.issn.1672-741X.2012.z1.015
There are many disadvantages, including difficulties, large cost and low construction efficiency, in shield tunneling in reclamation areas. Difficulties met in the shield tunneling in QianhaiLiyumen section of Shenzhen Metro line 1 and countermeasures are analyzed and summarized.
Key words: reclamation area; shield machine; tunneling control
/
| 〈 |
|
〉 |