- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
深圳益田地铁车站盖挖逆筑法施工技术
收稿日期: 2012-06-19
修回日期: 2012-09-18
网络出版日期: 2013-02-19
Topdown Construction Technologies for Yitian Metro Station of Shenzhen
Received date: 2012-06-19
Revised date: 2012-09-18
Online published: 2013-02-19
张君 . 深圳益田地铁车站盖挖逆筑法施工技术[J]. 隧道建设, 2012 , 32(增刊1) : 90 -94 . DOI: 10.3973/j.issn.1672-741X.2012.z1.019
The topdown construction technologies for Yitian Metro station of Shenzhen crossing Fuqiang road are presented. The key construction technologies of topdown construction technology are presented. The advantages and practicability are proved by construction effect and backfeeding. The paper can provide references for similar projects in the future.
/
| 〈 |
|
〉 |