浅埋暗挖地铁区间隧道绿色施工生产设施标准化配套研究
收稿日期: 2012-07-26
修回日期: 2012-09-10
网络出版日期: 2013-02-19
Study on Standardized Matching of Green Construction Facilities of Shallowburied Mined Tunnel Section
Received date: 2012-07-26
Revised date: 2012-09-10
Online published: 2013-02-19
张绍宽 , 刘智华 , 宋龙 . 浅埋暗挖地铁区间隧道绿色施工生产设施标准化配套研究[J]. 隧道建设, 2012 , 32(增刊2) : 13 -17 . DOI: 10.3973/j.issn.1672-741X.2012.z2.003
The study on combination green and environmentprotection facilities is the main point of standardized matching of green construction facilities of shallowburied mined tunnels. The purposes are mining construction risk control, construction environment improvement and informationaided construction. The mucking, transportation, ventilation and emergency communication of the facilities are studied.
/
| 〈 |
|
〉 |