Study on Construction Risk Control of Settlement of Rehabilitation for Existing Tunnel
Received date: 2012-06-19
Revised date: 2012-08-20
Online published: 2013-02-19
周清福 . 既有隧道破除改造沉降变形的施工风险控制研究[J]. 隧道建设, 2012 , 32(增刊2) : 117 -122 . DOI: 10.3973/j.issn.1672-741X.2012.z2.023
The No. 6 bid section of Harbin railway transit No. 1 line is a tunnel rehabilitation project with 1 500 m length. The surrounding environment of the existing tunnel is complicated. Single side enlarging and local double side enlarging method is adopted. In the paper, the settlement essence is analyzed. The influencing factors and countermeasure of settlement are analyzed in term of humanmachineenvironment system. The settlement control target and process are analyzed. The determination, carrying out and effect estimation of settlement control technologies are analyzed emphatically. The paper can provide references for similar projects in the future.
/
| 〈 |
|
〉 |