Study on Causes of Partial Collapse During Mined Large Span Jiangbeicheng Station Construction
Received date: 2012-09-17
Revised date: 2012-11-05
Online published: 2013-02-19
于明华 . 某大跨暗挖车站局部坍塌事故原因分析[J]. 隧道建设, 2012 , 32(增刊2) : 123 -127 . DOI: 10.3973/j.issn.1672-741X.2012.z2.024
Jiangbeicheng station is a mined large span station on No.6 line of Chongqing rail transit system. There is 9 190 337 Yuan economic losses caused by the big collapse happened during the construction of this station, though no casualty is leaded. In this paper, the construction method for Jiangbeicheng station is introduced first. And then the direct and indirect causes of the collapse are analyzed and the prevention measures are proposed for the similar construction condition.
Key words: rail transit system; mined large span station; collapse
/
| 〈 |
|
〉 |