- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2012-07-26
修回日期: 2012-09-17
网络出版日期: 2013-02-19
Study on Air Quality Control Measures for Metro Tunnel Constructed by ShallowBuried Mining Method
Received date: 2012-07-26
Revised date: 2012-09-17
Online published: 2013-02-19
张绍宽 , 刘智华 . 浅埋暗挖地铁区间隧道洞内空气质量控制措施研究[J]. 隧道建设, 2012 , 32(增刊2) : 133 -135 . DOI: 10.3973/j.issn.1672-741X.2012.z2.026
In order to decrease dust and exhaust contents in air, improve construction condition and reduce causes of occupational disease in tunnels constructed by shallowburied mining method, a suitable arrangement scheme of electric driven transportation equipment, dust collector and new type concrete spraying machine is introduced in this paper. And the aims of controlling dust and harmful gas contents in tunnel and improving construction condition of mined tunnel are achieved by this scheme.
/
| 〈 |
|
〉 |