- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
TBM施工风险与应对措施
收稿日期: 2012-12-07
修回日期: 2012-12-29
网络出版日期: 2013-03-05
基金资助
国际合作专项(2011DFB71550)
Risks in Tunneling by TBM and Their Countermeasures
Received date: 2012-12-07
Revised date: 2012-12-29
Online published: 2013-03-05
陈馈 , 冯欢欢 . TBM施工风险与应对措施[J]. 隧道建设, 2013 , 33(2) : 91 -97 . DOI: 10.3973/j.issn.1672-741X.2013.02.001
he causes for the risks in tunneling by TBM are analyzed and summarized in terms of geological conditions, equipments and working teams. The geological factors are described in detail, and the requirements for equipments and working teams are proposed. Furthermore, countermeasures are proposed for the risks. In the end, the risks and coun termeasures of Hsuehshan tunnel are presented and analyzed. The paper can provide reference for TBM design, riskanalysis and risk prevention of similar projects in the future.
Key words: TBM; tunneling risk; risk analysis; equipment design; general compact TBM; DSUTBM; dualmode TBM
/
| 〈 |
|
〉 |