兰渝高速铁路砂质围岩隧道初期支护结构安全度研究
收稿日期: 2012-10-19
修回日期: 2012-12-10
网络出版日期: 2013-03-05
基金资助
铁道部科技研究开发计划重大课题(2011G004)
Study on Safety Degree of Primary Support Structure of Tunnel in Sandy Rock Mass on LanzhouChongqing Highspeed Railway
Received date: 2012-10-19
Revised date: 2012-12-10
Online published: 2013-03-05
朱得华 , 梁斌 , 于少辉 , 杨朝帅 . 兰渝高速铁路砂质围岩隧道初期支护结构安全度研究[J]. 隧道建设, 2013 , 33(2) : 135 -141 . DOI: 10.3973/j.issn.1672-741X.2013.02.008
In the construction of a tunnel in sandy rock mass on LanzhouChongqing highspeed railway, advance reinforcement is made by means of horizontal jet grouting. The distribution of the pressure of the sandy rock mass and the loading characteristics of the primary support structure are analyzed by means of finite element numerical simulation and on basis of the monitoring data of the rock mass pressure and steel arch stress. The study results show that the safety degree of the primary support structure of the tunnel prereinforced by horizontal jet grouting can meet relevant requirements and has some margin. The paper can provide theoretical reference for the optimization design and construction of tunnels in sandy rock mass in the future.
/
| 〈 |
|
〉 |