- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2012-07-02
修回日期: 2012-11-01
网络出版日期: 2013-03-05
Analysis on Technical Difficulties in Construction of Yangtze Rivercrossing Tunnel on Weisan Road in Nanjing
Received date: 2012-07-02
Revised date: 2012-11-01
Online published: 2013-03-05
张士龙 . 南京纬三路过江通道工程技术难点分析[J]. 隧道建设, 2013 , 33(2) : 147 -150 . DOI: 10.3973/j.issn.1672-741X.2013.02.010
The difficulties in shield boring through complex sandy cobble ground with high permeability and high water pressure, including stability control of excavation face, filter membrane forming, wearing of cutter head and cutting tools and replacing of cutting tools under hyperbaric conditions, are analyzed. As a result, the topics to be studied, such as filter membrane forming in ground with high permeability, filter membrane forming mechanisms, stability of filter membrane and air tightness under hyperbaric conditions and cutting tool replacing under hyperbaric conditions, are presented. The paper can provide reference for the construction of extralong rivercrossing tunnels under high water pressure.
/
| 〈 |
|
〉 |