越既有结构车站围护桩成桩综合施工技术
收稿日期: 2012-08-29
修回日期: 2012-11-28
网络出版日期: 2013-03-05
Comprehensive Construction Technologies for Retaining Piles Penetrating through Existing Structures
Received date: 2012-08-29
Revised date: 2012-11-28
Online published: 2013-03-05
邓珣 . 越既有结构车站围护桩成桩综合施工技术[J]. 隧道建设, 2013 , 33(2) : 151 -155 . DOI: 10.3973/j.issn.1672-741X.2013.02.011
The retaining piles of Museum station of Harbin Metro penetrate through underground shopping street and civil air defense tunnels. Rotary drilling machines equipped with alloy drill bits with teeth are used to penetrate through the floor slabs of existing structures. For the cavities between the existing structures, steel cases are used to protect the borehole walls and reinforced concrete is used to seal the cavities. In the end, the target of rapid and easy construction of retaining piles penetrating through existing structures is reached.
/
| 〈 |
|
〉 |