大断面黄土隧道施工工法研究
收稿日期: 2012-10-29
修回日期: 2012-12-20
网络出版日期: 2013-03-23
Research on Construction Methods for Large Crosssection Loess Tunnels
Received date: 2012-10-29
Revised date: 2012-12-20
Online published: 2013-03-23
石磊 , 侯小军 , 武进广 . 大断面黄土隧道施工工法研究[J]. 隧道建设, 2013 , 33(3) : 173 -178 . DOI: 10.3973/j.issn.1672-741X.2013.03.001
Site monitoring is made during the construction of Dunliang tunnel. Comparison and contrast are made, on basis of the monitoring results, among double side drift method, single side drift method and threebench method in terms of advantages, disadvantages and applicability. Conclusions drawn are as follows: Double side drift method has high safety coefficient, high applicability and obvious relaxcontrol effect, but has high cost; Single side drift method has little disturbance to the rock mass, but has slow construction advance rate; Threebench method has obvious advantages in construction advance rate, but has poor deformationcontrol effect in adverse geological conditions; Countermeasures, such as timely ring forming, footlocking bolts and good control of the distance between the tunnel face and the invert, have good effect in deformation control.
/
| 〈 |
|
〉 |