- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2012-03-06
修回日期: 2013-02-01
网络出版日期: 2013-03-23
Technology for Methane Releasing in Shield Tunneling Through Qiantang River Formation: Case Study on Line 1 of Hangzhou Metro
Received date: 2012-03-06
Revised date: 2013-02-01
Online published: 2013-03-23
徐国庆 , 岳丰田 , 王弘琦 , 张荣辉 . 杭州地铁1号线穿越钱塘江地层沼气释放技术探讨[J]. 隧道建设, 2013 , 33(3) : 247 -251 . DOI: 10.3973/j.issn.1672-741X.2013.03.014
Line 1 of Hangzhou Metro passes through Qiantang River formation, which contains large amount of methane. Therefore, there is great risk in shield tunneling. The methane is mainly located at the junction between the silty clay and silty sand. Methane releasing trials are made so as to understand the occurrence characteristics of the methane and, in turn, to make preparations to take countermeasures. During the shield tunneling, no methane outburst occurs, which demonstrates that the methane releasing is effective.
Key words: Line 1 of Hangzhou Metro; methane; occurrence; release; blowout
/
| 〈 |
|
〉 |