- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2012-12-28
修回日期: 2013-02-01
网络出版日期: 2013-04-12
Case Study on Technologies for Coal and Gas Outburst Prevention in Cutting Through Coal Seams in Fa’er Highway Tunnel
Received date: 2012-12-28
Revised date: 2013-02-01
Online published: 2013-04-12
徐文平 , 宋聚勇 , 黄长国 , 李秋林 . 发耳隧道揭煤防突技术[J]. 隧道建设, 2013 , 33(4) : 309 -314 . DOI: 10.3973/j.issn.1672-741X.2013.04.010
Fa’er tunnel on ShuiPan highway in Guizhou province is a tunnel with coal and gas outburst risks, which faces risk factors such as coal and gas outburst, gas explosion and poor stability of rock mass in tunnel construction. In order to ensure the safety during the tunnel construction, a series of countermeasures normally taken in the coal mining industry are introduced to the highway tunnel construction. A program to prevent coal and gas outburst is designed according to the principle of “regional measures in advance, local measures to supplement and the priority given to regional measures”. In the end, the tunneling has passed through the coal seams safely, a series of outburst prevention technologies suitable for highway tunnels have been established and good social and economic significance has been achieved. The paper can provide reference for similar projects in the future.
/
| 〈 |
|
〉 |