- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
公路沉管隧道的发展及其关键技术
收稿日期: 2012-05-11
修回日期: 2012-08-02
网络出版日期: 2013-05-16
基金资助
国家科技支撑计划项目(2011BAG07B00)
Development and Key Technologies of Immersed Highway Tunnels
Received date: 2012-05-11
Revised date: 2012-08-02
Online published: 2013-05-16
张志刚 , 刘洪洲 . 公路沉管隧道的发展及其关键技术[J]. 隧道建设, 2013 , 33(5) : 343 -347 . DOI: 10.3973/j.issn.1672-741X.2013.05.002
The three major development phases witnessed by immersed highway tunnels are summarized, the key technological issues of immersed highway tunnels, such as the longitudinal profile, structural crosssection, foundation and tube element joints of immersed highway tunnels, are analyzed, and the critical issues and solutions for Hong KongZhuhaiMacao immersed tunnel are presented.
/
| 〈 |
|
〉 |