• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码
研究与探索

武汉首例矩形顶管地铁出入口施工监测及数值模拟分析

  • 陈聪 ,
  • 郑新定 ,
  • 陈扬勋 ,
  • 王超 ,
  • 钟世华 ,
  • 贺斌
展开
  • (1.武汉地铁集团有限公司, 湖北武汉 430030; 2.中铁隧道勘测设计院有限公司, 天津 300133; 3.中铁五局(集团)有限公司, 湖南长沙 410117)
陈聪(1981—),男,湖北钟祥人,2009年毕业于同济大学隧道及地下建筑工程专业,博士,高级工程师,现从事隧道及地下建筑工程研究及管理工作。

收稿日期: 2013-01-31

  修回日期: 2013-03-26

  网络出版日期: 2013-05-16

Construction Monitoring and Numerical Simulation Analysis of the First Metro Entrance/exit Tunnel Constructed by Rectangular Pipe Jacking Method in Wuhan

  • CHEN Cong ,
  • ZHENG Xinding ,
  • CHEN Yangxun ,
  • WANG Chao ,
  • ZHONG Shihua ,
  • HE Bin
Expand
  • (1 Wuhan Metro Group Co, Ltd, Wuhan 430030, Hubei, China; 2 China Railway Tunnel Survey & Design Institute Co, Ltd, Tianjin 300133, China; 3 China Railway No 5 Bureau Group Co, Ltd, Changsha 410117, Hunan, China)

Received date: 2013-01-31

  Revised date: 2013-03-26

  Online published: 2013-05-16

摘要

为研究矩形顶管施工对周边环境的影响,以武汉地铁2号线王家墩东站Ⅳ号出入口兼过街通道采用的矩形顶管技术试验工程为背景,通过对矩形顶管法地下通道施工过程的现场监测和三维数值模拟,分析矩形顶管施工对周围环境的影响及地层位移的变化规律,得到武汉长江Ι级阶地区地下通道采用偏心多轴多刀盘土压平衡式矩形顶管技术施工的一般规律。实测数据分析结果和数值模拟结果表明: 1)地表的最终沉降值与该处对应断面的开挖时序成正比; 2)顶管机掌子面前方土体产生地表隆起,掌子面后方土体产生地表沉降; 3)地层沉降位移随距离顶管顶进轴线的增大而减小,影响范围约为3倍洞径。

本文引用格式

陈聪 , 郑新定 , 陈扬勋 , 王超 , 钟世华 , 贺斌 . 武汉首例矩形顶管地铁出入口施工监测及数值模拟分析[J]. 隧道建设, 2013 , 33(5) : 354 -361 . DOI: 103973/jissn1672-741X201305004

Abstract

No 4 entrance/exit tunnel of Wangjiadun East station on Line 2 of Wuhan Metro is the first tunnel in Wuhan that has been built by rectangular pipe jacking method The authors analyze the influence on the surrounding environment and the ground displacement laws imposed by tunneling by rectangular pipe jacking method by means of field monitoring and threedimensional numerical simulation, with the construction of No 4 entrance/exit tunnel of Wangjiadun East station as an example. Conclusions drawn are as follows: 1) The final ground surface settlement is proportional to the excavation timing of the corresponding crosssection; 2) Ground surface heaving occurs in front of the face of the pipe jacking machine, while ground surface settlement occurs behind the face of the pipe jacking machine; 3) The ground surface settlement decreases as the distance from the rectangular pipe jacking axis increases, and the range of the influence is about 3 times of the tunnel diameter

文章导航

/

〈 〉