南水北调中线穿黄隧洞工程的技术难点分析和对策
收稿日期: 2013-01-05
修回日期: 2013-03-08
网络出版日期: 2013-05-16
Analysis on and Countermeasures for Technical Difficulties in Construction of Yellow River Crossing Tunnel on Central Route of SouthtoNorth Water Transfer Project
Received date: 2013-01-05
Revised date: 2013-03-08
Online published: 2013-05-16
郑清君 , 仲生星 . 南水北调中线穿黄隧洞工程的技术难点分析和对策[J]. 隧道建设, 2013 , 33(5) : 398 -406 . DOI: 10.3973/j.issn.1672-741X.2013.05.012
In the construction of Yellow River Crossing Tunnel on Central Route of SouthtoNorth Water Transfer Project, there are great technical difficulties related to the superdeep mortar wall, superdeep circularshaped diaphragm wall, superdeep circular vertical shaft, superdeep tunnel eye reinforcement and prestressed thin secondary lining. In the paper, analysis is made on these technical difficulties and countermeasures are proposed. In the end, satisfactory effect has been achieved and the tunnel has been built successfully.
/
| 〈 |
|
〉 |