- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
旅客自动输送系统轨道设计要点
收稿日期: 2013-03-10
修回日期: 2013-05-01
网络出版日期: 2013-07-25
Key Points of Design of Tracks of Automated People Mover System
Received date: 2013-03-10
Revised date: 2013-05-01
Online published: 2013-07-25
罗信伟 . 旅客自动输送系统轨道设计要点[J]. 隧道建设, 2013 , 33(6) : 469 -473 . DOI: 10.3973/j.issn.1672-741X.2013.06.008
APM system in Zhujiang New Town of Guangzhou is the first APM line designed by domestic institute. Problems prone to occur during the design and construction of APM system are summarized and discussed on basis of design, construction and operation experience. Conclusions drawn are as follows: 1) Rational structural heights should be selected for tracks in circular tunnels; 2) Rational guide rails and guide rail supports should be designed, so as to improve the manufacture precision and the adjustability of the track structure; 3) Measures to improve the durability and repairability of the surface layer of running tracks should be further studied; 4) Relevant discipline interfaces should be carefully coordinated.
/
| 〈 |
|
〉 |