- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2013-04-09
修回日期: 2013-05-07
网络出版日期: 2013-07-25
Key Technologies for Borehole Drilling by Rotary Drilling Machines in Heterogeneous Ground: Case Study on Bored Piles of Vertical Shaft of Xiangjiang River Crossing Tunnel
Received date: 2013-04-09
Revised date: 2013-05-07
Online published: 2013-07-25
赵全民 . 湘江隧道江心洲竖井上软下硬地层旋挖成孔关键技术[J]. 隧道建设, 2013 , 33(6) : 510 -514 . DOI: 10.3793/j.issn.1672-741X.2013.06.013
The bored piles of the vertical shaft of Xiangjiang river crossing tunnel on Yingpan road in Changsha are located in heterogeneous ground, i.e., sandy cobble strata in the upper part and mediumweathered slate in the lower part. During the construction of the bored piles, serious borehole collapse, slurry leakage and other problems occur. Technologies, including strictly controlling the slurry indexes, using polymeric slurry, using wearresistant drill bit with alloy bulletshaped teeth and backfilling high quality soil, are adopted. In the end, the construction of the bored piles has been completed successfully and the pile quality is guaranteed.
/
| 〈 |
|
〉 |