采用万能杆件悬吊保护横穿基坑的1.8 m给水管施工技术
收稿日期: 2013-03-22
修回日期: 2013-05-07
网络出版日期: 2013-07-25
Suspension Protection of 1.8 m Watersupply Pipe Crossing Foundation Pit by means of Universal Bars
Received date: 2013-03-22
Revised date: 2013-05-07
Online published: 2013-07-25
张军 . 采用万能杆件悬吊保护横穿基坑的1.8 m给水管施工技术[J]. 隧道建设, 2013 , 33(6) : 521 -525 . DOI: 10.3973/j.issn.1672-741X.2013.06.015
The protection of underground utility lines is one of the difficult and critical points in the construction of Metro projects. A 1.8 m diameter castion watersupply pipe crosses the foundation pit of the running tunnel from South Railway station to South Sanhuan road station. The water supply pipe must be well protected in order to ensure normal water supply. Suspension protection is adopted for the water supply pipe. The scheme of the protection of the water supply pipe by means of universal bars is presented, structural calculation is made, and the construction technology is described with emphasis. The monitoring results show that the settlement of the water supply pipe meets relevant requirements and that the protection technology adopted is effective and reliable.
/
| 〈 |
|
〉 |