单洞双线高速铁路隧道Ⅲ级围岩仰拱快速施工技术
收稿日期: 2013-03-09
修回日期: 2013-05-16
网络出版日期: 2013-07-17
Rapid Construction Technology for Inverts of Doubletrack Highspeed Railway Tunnels in Grade Ⅲ Rock Mass
Received date: 2013-03-09
Revised date: 2013-05-16
Online published: 2013-07-17
李有业 , 任国臣 . 单洞双线高速铁路隧道Ⅲ级围岩仰拱快速施工技术[J]. 隧道建设, 2013 , 33(7) : 586 -590 . DOI: 10.3973/j.issn.1672-741X.2013.07.010
At present, the invert and filling construction of highspeed railway tunnels has too many procedures, which induces slow construction progress and, in the end, delays the project schedule. In the paper, the construction scheme of inverts and their filling normally adopted in the construction of doubletrack highspeed railway tunnels in Grade III rock mass is analyzed and optimized, and a new rapid technology for the invert and filling construction, which includes long trestle, slip form and separating the filling construction from the invert construction, is developed. The new construction technology developed has been applied in the construction of Naji tunnel on YunnanGuangxi railway, which increases the invert and filling construction rate from 96 m/month to 175 m/month.
/
| 〈 |
|
〉 |