盾构暗挖过站施工技术的研究与应用
收稿日期: 2013-05-07
修回日期: 2013-05-27
网络出版日期: 2013-07-17
Technology for Shield Transferring Mined Station Tunnel
Received date: 2013-05-07
Revised date: 2013-05-27
Online published: 2013-07-17
刘恕全 , 李江 , 朱光涛 , 关丽娟 . 盾构暗挖过站施工技术的研究与应用[J]. 隧道建设, 2013 , 33(7) : 591 -596 . DOI: 10.3973/j.issn.1672-741X.2013.07.011
The procedure, risks and countermeasures of shield transferring mined station tunnels are studied, with a shield transferring a mined station tunnel in Guangzhou Metro as an example. A station transfer method based on track system is developed and applied in the works. In the end, the horizontal moving and upward moving of the shield are guaranteed and satisfactory results are achieved.
Key words: shield; mined station tunnel; station transfer; upward moving; guide and control
/
| 〈 |
|
〉 |