- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
兰渝铁路胡麻岭隧道第三系弱成砂岩蠕变特性试验研究
收稿日期: 2013-05-07
修回日期: 2013-06-30
网络出版日期: 2013-08-23
Test Research on Creeps of Tertiary Weak Sandstone: Case Study on Humaling Tunnel on LanzhouChongqing Railway
Received date: 2013-05-07
Revised date: 2013-06-30
Online published: 2013-08-23
陈德彪 . 兰渝铁路胡麻岭隧道第三系弱成砂岩蠕变特性试验研究[J]. 隧道建设, 2013 , 33(8) : 659 -663 . DOI: 10.3973/j.issn.1672-741X.2013.08.006
Humaling tunnel on LanzhouChongqing railway passes through Tertiary waterrich weak sandstone. Serious deformation occurs during the construction of the tunnel. Creeping test is made on the soil samples and the characteristics of the weak sandstone are obtained, the creeping characteristics of soils with different water content rates are analyzed, the relationship between the deformation and the deformationlasting time of soils with different water content rates is discussed, and corresponding tunnel design principle and tunnel construction methods are proposed.
/
| 〈 |
|
〉 |