北京地下直径线大断面暗挖隧道衬砌施工技术
收稿日期: 2013-05-28
修回日期: 2013-06-30
网络出版日期: 2013-08-23
Lining Technology for Large Crosssection Tunnel Constructed by Mining Method in Urban Area: Case Study on Underground Tunnel Connecting Beijing Railway Station and Beijing West Railway Station
Received date: 2013-05-28
Revised date: 2013-06-30
Online published: 2013-08-23
雷宏亮 . 北京地下直径线大断面暗挖隧道衬砌施工技术[J]. 隧道建设, 2013 , 33(8) : 684 -689 . DOI: 10.3973/j.issn.1672-741X.2013.08.011
Different lining methods are studied in terms of lining efficiency, economy and settlement and deformation control, so as to select proper lining methods for the PBA section and CRD section of the underground tunnel connecting Beijing Railway Station and Beijing West Railway station. Conclusions drawn are as follows: 1) Both composite steel formwork lining method and formwork trolley lining method have their own applicability and limitations and should be rationally selected according to the excavation methods, crosssection dimensions and environment of the tunnel. 2) The mentioned two lining methods are optimized in terms of safety and quality control. The paper can provide reference for similar projects in the future.
/
| 〈 |
|
〉 |