- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
小平地隧道进口危岩落石分析及整治设计
收稿日期: 2013-02-21
修回日期: 2013-08-17
网络出版日期: 2013-09-18
An Analysis and Design for the Treatment of Rock Falls at the Entrance Portal of Xiaopingdi Tunnel
Received date: 2013-02-21
Revised date: 2013-08-17
Online published: 2013-09-18
罗章波 . 小平地隧道进口危岩落石分析及整治设计[J]. 隧道建设, 2013 , 33(9) : 768 -773 . DOI: 10.3973/j.issn.1672-741X.2013.09.011
The development of the rock mass around the entrance portal of Xiaopingdi tunnel on the ChengduKunming railway is presented in this paper. The maximum diameter and volume of the falling rocks are determined by means of 3D laser scanning technology. The movement characteristics of the falling rocks, including the most likely place the rocks are going to fall, the bounce height of the falling rocks and their energy, are analyzed by means of rock fall simulation. The advantages of using the passive protective net and the steel shed tunnel as the safety measures are analyzed, and comprehensive countermeasures are proposed to cope with rock falls, so as to ensure the operation safety of the railway. The design concept and the rock fall protection structure presented in the paper can provide reference for similar projects in the future.
/
| 〈 |
|
〉 |