Design of No. 1 Shaft of Weihe Tunnel on BaojiLanzhou Passengerdedicated Railway
Received date: 2013-04-18
Revised date: 2013-09-10
Online published: 2013-11-15
吉艳雷 . 宝兰客专渭河隧道1号竖井设计[J]. 隧道建设, 2013 , 33(11) : 942 -948 . DOI: 10.3973/j.issn.1672-741X.2013.11.009
Weihe tunnel on BaojiLanzhou passengerdedicated railway is 10.016 km long. Three vertical shafts and two inclined shafts are installed for the tunnel so as to speed up the tunnel construction. With 54.4 m depth and 230 m2 excavation crosssection area, No. 1 vertical shaft of Weihe tunnel is an extralarge and deep shaft. The vertical shaft is located in hardsoft heterogeneous ground. Therefore, it is of great significance to select a safe and rational structure type, as well as a proper construction method, for the vertical shaft. Support structure consisting of secant piles and shotcreting and rockbolting, topdown construction method, as well as inner lining, are selected for the vertical shaft on basis of the actual geological conditions and the stress analysis results. Bracing made of reinforced concrete is installed when the vertical shaft is backfilled, so as to ensure the structural safety of the tunnel. This paper can provide reference for the design of similar projects in the future.
/
| 〈 |
|
〉 |