Design and Construction of Southern Part of Phase II Project of Line 8 of Beijing Metro
Received date: 2013-09-24
Revised date: 2013-10-29
Online published: 2013-12-27
李立 . 北京地铁8号线二期南段工程设计与施工[J]. 隧道建设, 2013 , 33(12) : 983 -988 . DOI: 10.3973/j.issn.1672-741X.2013.12.001
The Southern part section of Phase II Project of Line 8 of Beijing Metro,is located in central downtown area,has complicated surrounding environment and large design and construction difficulties. In this paper, the characteristics and difficulties of the project are analyzed.Key technologies,including shieldboring closely underneath existing Metro station, longistance shield boring underneath residual buildings,launching and receiving of shield machines of stacked tunnels, and Uturn and lifting of shield machine in mined cross gallery, as well as the designed program, technical innovations and technical countermeasures,are presented in detail. The paper can provide references for similar projects in the future.
/
| 〈 |
|
〉 |