Separate Launching of Shield to Bore underneath Sensitive Buildings in Winter:Case Study on Shield Launching for Guloudajie StationShichahai Station Section on Line 8 of Beijing Metro
Received date: 2013-09-05
Revised date: 2013-11-28
Online published: 2013-12-27
王刚 . 北京地铁8号线鼓楼大街站—什刹海站区间盾构冬季下穿平瓦房区分体始发施工技术[J]. 隧道建设, 2013 , 33(12) : 1041 -1047 . DOI: 10.3973/j.issn.1672-741X.2013.12.011
There are many difficulties in the shield launching for Metro tunnels in urban areas, such as difficulties related to limited site area, cold weather and sensitive buildings. During the launching of the shield for Guloudajie StationShichahai Station section on Line 8 of Beijing Metro, countermeasures, including separate shield launching, cutterhead opening ratio optimization, heat preservation, boring parameter control and accurate management, are taken. Due to the countermeasures mentioned above, successful shield launching has been achieved, the settlement of the sensitive buildings has been brought under effective control and the safety of the sensitive buildings has been guaranteed.
Key words: Beijing Metro; shield; winter; separate shield launching; construction technology
/
| 〈 |
|
〉 |