Settlement Control Technologies for Longdistance Shield Boring Underneath Old Residual Building Groups: Case Study on Guloudajie StationChina Art Gallery Station Section of Line 8 of Beijing Metro
Received date: 2013-09-12
Revised date: 2013-11-18
Online published: 2013-12-27
徐骞 , 李立 . 北京地铁8号线鼓—中区间盾构长距离穿越古建民房群沉降控制技术[J]. 隧道建设, 2013 , 33(12) : 1048 -1053 . DOI: 10.3973/j.issn.1672-741X.2013.12.012
The running tunnel from Guloudajie Satation to China Art Gallery Station on Line 8 of Beijing Metro crosses underneath old residual building groups for long distance. There is great difficulty in the monitoring and control of the settlement induced by tunneling. The zone within the scope of 15 m on both sides of the center line of the running tunnel is determined, by means of engineering analogy and theoretical calculation, as the zone heavily influenced by tunneling. The buildings located in the mentioned zone are monitored on basis of their positions and types. Technologies, including insidetunnel radial grouting, ground surface Soletanche grouting and insidetunnel grouting assisted by ground surface Soletanche grouting, are adopted to cope with different conditions. Furthermore, ground conditioning and simultaneous grouting assisted by insidetunnel radial grouting are made in waterrich cobble strata. In the end, the ground surface settlement is brought under effective control and safe and successful shield boring is guaranteed.
/
| 〈 |
|
〉 |