Construction of Roof Slab of Reserved Opening of Metro Station by Suspended Formwork Technology
Received date: 2013-09-05
Revised date: 2013-10-20
Online published: 2013-12-27
陈典华 . 地铁车站预留洞口现浇顶板吊模施工技术[J]. 隧道建设, 2013 , 33(12) : 1054 -1058 . DOI: 10.3973/j.issn.1672-741X.2013.12.013
The construction of roof slab of reserved opening of Metro station is common. The suspended formwork technology used in the construction of the largespan and largethickness castinsitu roof slab of reserved opening of Andelibeijie station is presented in terms of construction program selection, construction program design and calculation, construction procedure, safety, quality and difficulties. Conclusion is drawn that the suspended formwork technology is suitable for the construction of the largespan and largethickness castinsitu roof slab of reserved opening of Metro station.
Key words: Beijing Metro; station; reserved opening; castinsitu roof slab; suspended formwork
/
| 〈 |
|
〉 |