- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2013-09-04
修回日期: 2013-12-02
网络出版日期: 2013-12-27
Application of Steel Frame in Metro Station Constructed by Cutandcover Method: So as to Achieve Earlier Shield Launching
Received date: 2013-09-04
Revised date: 2013-12-02
Online published: 2013-12-27
熊桂荣 . 型钢排架在盾构始发明挖车站结构施工中的应用[J]. 隧道建设, 2013 , 33(12) : 1064 -1070 . DOI: 10.3973/j.issn.1672-741X.2013.12.015
Steel frame is used as the support of the intermediate slab of the 3rd underground floor of Guloudajie Station of Line 8 of Beijing Metro, so as to erect the backup system of the shield machine before the construction of the main structure of the Station is completed, and, in the end, to ensure earlier shield launching. In the paper, the design, calculation and construction technology of the steel frame are presented in detail, and key quality and safety control points and optimization measures of the steel frame are proposed. The practice shows that the steel frame used is feasible and that, due to the application of the steel frame, synchronization of Metro station structure construction and shield machine assembling can be realized.
/
| 〈 |
|
〉 |